Solar Array Requirement Checklist
Note: All plans must be submitted electronically in PDF format.
Building Permit
- Permit Application (Available at cityofammon.us - Building Department)
Requirements for All Installations
- Code Compliance: 2018 IBC code reference (or IRC, if applicable).
- Electrical Plans:
- One-line electrical diagram
- Full electrical diagram
- Site Details: Exact location of the solar array on the roof.
- Equipment Specifications: All racking and mounting must be U.L. listed (documentation required).
- Structural Integrity: Engineering letter with an Idaho stamp confirming the existing roof can support the load.
- Safety: All safety labeling as required by code.